+86-18761811774   info@tp-scaffold.com
Q235/Q345 Vertical Ringlock Scaffolding
You are here: Home » Products » Ringlock scaffolding » Q235/Q345 Vertical Ringlock Scaffolding

News Center

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button

Q235/Q345 Vertical Ringlock Scaffolding

1. Weight: varies to different sizes
2. Size: 0.5m, 1m, 1.5m, 2m, 2.5m, 3m, etc.
3. Include spigot
4. Surface finish: HDG, powder coated
Availability:
  • TPRSV000

  • TP

  • 73084000

  • 48.3 mm

  • varies to different sizes

  • HDG

  • Q235 

Ringlock scaffolding standard/ vertical:

1. Ringlock scaffolding standard /vertical is made of 48.3mm * 3.2mm the tube, 

2. Steel grade: Q235 or Q345; 

3. Welded with ringlock scaffolding rosettes with every interval of 50mm, no welding defect, passing press test; the ledger end and the rosette fit well together with the wedge pin to make stable ringlock scaffoling.
2. Surface finish: hot dip galvanised, long lasting from rusted, powder coated or painted protecting the surface with less cost, the powder or paint is with strong adhision to the tubes.
3. Packing: steel pallet
4. Various sizes are available for ringlock scaffolding standard:
 


Item NO.
Length (m) Weight (kg)
    TPRSV050          0.5M            2.9
    TPRSV100          1M            5.5
    TPRSV150          1.5M            7.8
    TPRSV200          2M           10.2
    TPRSV250          2.5M           12.2
    TPRSV300          3M           14.6
    TPRSV400          4M           19.1

ringlock scaffolding
Ringlock scaffolding standard

Ringlock scaffolding yellow powder coated

Ringlock scaffolding vertical

Ringlock scaffolding vertical

Ringlock system scaffolding

   1. Ringlock system scaffolding /Multidirectional systsm scaffolding are built to be the most reliable and efficient scaffolding available.
   2. Components: verticals/ standards, ledgers/ horizontals, diagonal braces, base collars, steel planks, base jacks, rosettes/ round rings, ledger ends, brace ends, wedge, stairways, etc.
    3. 
Steel grade: Q235 and Q345
    4. 
Surface finish: HDG, powder coated, etc.
    5. 
Whether you are in the market for a complete scaffolding system, or just need accessories that are compatible with your current ringlock scaffolding system or your production, we are here to assist with your next building project or manufacturing need.

ringlock scaffolding system

FAQ

1.---What is your product range?
   ---Ringlock system, frame system, tubes and couplers, cuplock system, props, other scaffolding accessories and metal products.

2.---What is MOQ?
   ---Usually we don't have a MOQ, but it depends on the product you are looking for.

3.---Can I request samples?Is it free?
   ---Yes, we can offer free samples on most itmes if it is not too heavy or big.

4.---Do you offer OEM service?
   ---Yes

5.---How you do the quality control?
   ---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.---Do you have certificate?
   ---Clients need to pay the cost to do the test from Third Party Testing Agent.Factory certificates can be offered for some products. We have testing machines in the factory, and also working with labs for testing.

7.---What is production time?
   ---Usually it takes 25-30 days for the first container, production goes faster after the first container once all raw materials are ready. The more the faster. Partial shipment can be arranged if requested.

8.---What is your payment term?
   ---T/T is prefered. L/C at sight can be accepted in some area.

9.---What is your after-sale service?
   ---All the after-sale problems will be solved based on mutual friendly communication.
       In case of quantity shortage, the detailed certificates should be sent to our side in seven days after the goods arrive at  your warehouse. In case of quality discrepancy, such as problems caused by raw material, welding, or surface finish, the detailed certificates should be sent to our side. If it is confirmed caused by our side for the above two mentioned situations, the loss will be compensated as the new goods sent to your side in next order.

 

Previous: 
Next: 

Random News

Nanjing Tuopeng Construction Technology Co., Ltd is a professional scaffolding manufacturer and exporter of all types of safest scaffolding materials from China,with fast delivery time and competitive prices.

Quick Links

Products

Contact Us

Tel:  +86-25-56872002
Cell:    +86-18761811774
E-mail: info@tp-scaffold.com
            tuopengscaffold@gmail.com
Add: No. 21 Chenlv Road, Xiongzhou Street, Luhe Area, Nanjing, Jiangsu, China
​Copyright © Nanjing Tuopeng Construction Technology Co.,Ltd. All Rights Reserved.