+86-18761811774    info@tp-scaffold.com
How Easy Is It To Set Up And Dismantle A Lobo Scaffolding System?
You are here: Home » News and Events » Industry news » How Easy Is It To Set Up And Dismantle A Lobo Scaffolding System?

How Easy Is It To Set Up And Dismantle A Lobo Scaffolding System?

Views: 222     Author: Mia     Publish Time: 2025-02-04      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Content Menu

Key Advantages of the LOBO Scaffolding System

Step-by-Step Setup Process

>> 1. Pre-Assembly Planning

>> 2. Component Preparation

>> 3. Base Assembly

>> 4. Platform Installation

>> 5. Vertical Expansion

>> 6. Final Safety Checks

Dismantling Procedure

Comparative Efficiency Analysis

Real-World Applications

>> Case Study 1: Industrial Maintenance

>> Case Study 2: Theater Lighting Installation

Safety and Compliance

Conclusion

FAQ

>> 1. What is the maximum height achievable with the LOBO system?

>> 2. Can LOBO integrate with existing scaffolding?

>> 3. Is specialized training required for assembly?

>> 4. How does LOBO handle uneven terrain?

>> 5. What prevents components from loosening during use?

Citations:

The LOBO Scaffolding System revolutionizes industrial maintenance and construction workflows by offering a tool-free, modular alternative to traditional scaffolding. Designed for rapid assembly and disassembly, it reduces labor costs by up to 90% compared to conventional methods while maintaining OSHA and EN1004 compliance[3][5]. This article explores the setup process, safety features, and practical applications of the system, supported by comparative data and real-world case studies.

How Easy Is It to Set Up and Dismantle a Lobo Scaffolding System

Key Advantages of the LOBO Scaffolding System

Speed: Erects 10x faster than traditional scaffolding[4].

Labor Efficiency: Requires 2 workers instead of 3–4 for equivalent tasks[3].

Versatility: Configurable into towers, bridges, mobile platforms, and edge protection systems[36].

Safety: Integrated guardrails, non-slip surfaces, and automatic 3:1 height-to-base stability ratio[6][5].

Step-by-Step Setup Process

1. Pre-Assembly Planning

- Design Flexibility: Configure systems using LOBO's modular components (trestle legs, cross tubes, Lobands) for towers, L-shapes, or mobile platforms[36].

- Load Calculations: Ensure a maximum safe working load of 550 lbs (250 kg) per platform[1].

2. Component Preparation

Core Components:

- Trestle legs with welded side/top clamps

- Round steel tubes (1.2m to 2.4m lengths)

- Loband couplers (tool-free clamping)

- Adjustable extensions and sway braces[2][37].

3. Base Assembly

Construct Trestle Frames:

- Connect two trestle legs using cross tubes at lower side clamps.

- Tighten Loband couplers by hand (5 Nm torque)[1].

Install Load-Bearing Tubes:

- Insert tubes through adjacent clamps to form horizontal support layers.

- Add sway braces diagonally to eliminate structural movement[2][6].

4. Platform Installation

- Secure Loboard Decking: Lock boards using T01 tubes and Lobands, ensuring L-bolts rest atop boards to prevent uplift[2].

- Toeboards & Handrails: Attach using clips or hinged wraps; secure with Lobands at every standing height[1][6].

5. Vertical Expansion

- Adjustable Extensions: Raise telescopic inserts by 39" increments, secured via height pins[37].

- Outriggers: Mandatory for structures >2m height to maintain 3:1 stability ratio[5][6].

6. Final Safety Checks

- Verify all Lobands are hand-tightened.

- Confirm guardrails enclose all open sides[8][9].

lobo scaffolding system_1

Dismantling Procedure

1. Reverse Assembly Order: Remove extensions, boards, and cross tubes.

2. Component Storage: Flat-pack into Towerstore containers for transport[36].

3. Time Savings: Dismantling takes 15–30 minutes for a 4m tower vs. 2+ hours for traditional scaffolding[3].

Comparative Efficiency Analysis

Metric LOBO System Conventional Scaffolding
Erect Time (4m Tower) 40–60 mins[3] 4–5 hours[3]
Labor Required 2 workers 3–4 workers
Reconfiguration Tool-free Requires spanners
Mobility Castor options Fixed structures

Real-World Applications

Case Study 1: Industrial Maintenance

- Task: Compressor maintenance in a 1.8m-wide corridor.

- LOBO Setup: Narrow-configuration tower erected in 40 minutes[38].

- Outcome: 85% faster than tube-and-clamp alternatives[3].

Case Study 2: Theater Lighting Installation

- Configuration: Tiered platforms over seating.

- Feature: Adjustable legs for uneven surfaces[6][36].

Safety and Compliance

- Certifications: EN1004, BS 1139, OSHA/ANSI A10.8[5][6].

- Fall Prevention: Advanced guardrails pre-installed above work levels[3][37].

- Load Limits: 660 lbs uniformly distributed per Loboard[37].

Conclusion

The LOBO Scaffolding System eliminates the complexity of traditional scaffolding through intuitive, tool-free assembly and unmatched reconfigurability. With erections completed in under an hour and seamless integration into tight spaces, it empowers maintenance teams to work safer, faster, and more cost-effectively.

lobo scaffolding system_2

FAQ

1. What is the maximum height achievable with the LOBO system?

The LOBO System supports free-standing heights up to 10m (32ft) when adhering to the 3:1 base ratio or using outriggers[5][17].

2. Can LOBO integrate with existing scaffolding?

Yes, Lobands connect to most standard scaffolding tubes and clamps[5][33].

3. Is specialized training required for assembly?

Basic competency training (18-minute video) suffices for most configurations[6][37].

4. How does LOBO handle uneven terrain?

Adjustable legs and low-band couplers enable level platforms on slopes or stairs[2][5].

5. What prevents components from loosening during use?

L-bolts feature retention mechanisms and require only hand-tightening (5 Nm)[1][5].

Citations:

[1] https://lobosystems.com/wp-content/uploads/2023/05/Tower-instructions.pdf

[2] https://www.youtube.com/watch?v=FHdAmqqYy4Q

[3] https://www.omicsonline.org/open-access/lobo-system-scaffold-2472-0518-1000i-104.php?aid=85213

[4] https://www.technologycatalogue.com/product_service/lobo-advanced-work-platform-system

[5] https://lobosystems.com/faqs/

[6] https://www.sunnysidesupply.com/why-choose-lobo/

[7] https://www.youtube.com/watch?v=mwDagkWRTOk

[8] https://lobosystems.com/wp-content/uploads/2023/03/Instruction_Dos_And_Donts_8_16.pdf

[9] https://lobosystems.com/wp-content/uploads/2023/05/Code-of-Safe-Pract.pdf

[10] https://www.youtube.com/watch?v=XkqrGMhgZfs

[11] https://protekta.co.za/wp-content/uploads/2022/03/LOBO-Catalogue.pdf

[12] https://www.youtube.com/user/Woodlands08/videos

[13] https://www.youtube.com/watch?v=oJNYHEXa86Q

[14] https://www.youtube.com/watch?v=-ACgBl_kd6s

[15] https://www.youtube.com/watch?v=mPIDEzAI77w

[16] https://www.youtube.com/watch?v=V_LwqzUvVXQ

[17] https://www.linkedin.com/pulse/lobo-advanced-platform-system-faqs-robert-bokros

[18] https://www.youtube.com/watch?v=LT8AuzGFlok

[19] https://lobosystems.com/wp-content/uploads/2023/05/LOBO-Systems-Course-Syllabus-Rev-7.pdf

[20] https://lobosystems.com

[21] https://www.youtube.com/@lobosystems

[22] https://www.instagram.com/lobosystems/

[23] https://www.instagram.com/sacent_group_ltd/p/DClrbgDuipG/

[24] https://archello.com/product/2134/attachments/photos-videos/1

[25] https://www.youtube.com/watch?v=GiM_vOXe77Q

[26] https://www.ebay.co.uk/itm/326165156199

[27] https://lobosystems.com/lobo-systems-launches-new-video-demonstration-showing-how-companies-can-change-their-work-at-height-systems/

[28] https://www.facebook.com/protektasafetygear/photos/discover-the-lobo-work-platform-system-tailored-to-your-needs-it-eliminates-the-/1036849591774145/

[29] https://protekta.co.za/lobo-work-platform-system/

[30] https://www.scaffoldingsolutions.com/articles/scaffolding-faqs/

[31] http://forum.iosh.co.uk/posts/t74687-Lobo-scaffolding

[32] https://www.sunnysidesupply.com/products-services/lobo/

[33] https://pdf.aeroexpo.online/pdf/lobo-systems-td/ultimate-access-system/172081-2246.html

[34] https://www.youtube.com/watch?v=-dSFIxDIa_0

[35] https://www.materialhandling247.com/product/lobo_systems_lobo_advanced_automation_maintenance_system

[36] https://lobosystems.com/what-is-lobo/

[37] https://www.youtube.com/watch?v=FHdAmqqYy4Q

[38] https://www.omicsonline.org/open-access/lobo-system-scaffold-2472-0518-1000i-104.php?aid=85213

[39] https://uk.energytechnologyplatform.com/product_service/lobo-advanced-work-platform-system

Table of Content list
Lina
Hello, I’m Lina. With over 15 years of experience in the scaffolding industry, I am here to provide you with expert solutions customized to your needs. Whether you're seeking advice, or quality products, I am dedicated to helping you achieve success. Don't hesitate to reach out — let's discuss how we can work together to fulfill your requirements. Send an Inquiry Now and take the first step towards transforming your scaffolding requirements into reality.

News

Nanjing Tuopeng Construction Technology Co., Ltd is a professional scaffolding manufacturer and exporter of all types of safest scaffolding materials from China,with fast delivery time and competitive prices.

Quick Links

Products

Contact Us

Tel:  +86-25-56872002
Cell:    +86-18761811774
E-mail:  info@tp-scaffold.com
             tuopengscaffold@gmail.com
Add: No. 21 Chenlv Road, Xiongzhou Street, Luhe Area, Nanjing, Jiangsu, China
​Copyright © Nanjing Tuopeng Construction Technology Co.,Ltd. All Rights Reserved.